Projects & track record

Engineering contributions to Singapore’s transport, water and airport infrastructure.

These selected projects show the scope of SGT’s consultancy work. Project owners, contractors and SGT’s role are listed separately within each profile.

Full project register

SGT’s supplied track record, dated October 2026. Dates and roles below refer to that record; “present” means the reporting date.

  1. 2025

    2025–present

    Changi East Megaspine, T5C Advance Works & Ventilation Building

    ERSS design consultancy for the ventilation building.

  2. 2024

    2024–present

    P103 · Riviera Interchange Station & Tunnels

    Bored tunnel temporary works, TBM facilities, conveyor assessment and lifting foundations.

  3. 2024

    2024–present

    CR203 · Turf City Station & Tunnels

    Temporary works for TBM launching, operation and dismantling.

  4. 2024

    2024–present

    P102 · Elias Station & Tunnels

    Temporary works consultancy, including TBM thrust frame design.

  5. 2024

    2024–present

    CR211 · Jurong Lake District Station & Tunnels

    QP geotechnical supervision.

  6. 2023

    2023–present

    CR202 · Fairways Drive to Sin Ming Walk

    Bored tunnel temporary works, TBM facilities and invert cast bridge.

  7. 2023

    2023–2024

    CR203 · Turf City Station & Tunnels (tender)

    QP tender design for tunnel lining, cross passages, TBM parameters and impact assessment.

  8. 2022

    2022–present

    CR111 · Defu Station & Tunnels

    QP geotechnical supervision.

  9. 2022

    2022–2024

    CR102 · Aviation Park Station to Depot

    Temporary works consultancy and segment precast yard substation design.

  10. 2021

    2021–2026

    C3A · Tuas Water Reclamation Plant

    Structural design of buried pipes, thrust blocks and fire hydrant pipe works.

  11. 2021

    2021

    T215 · Mount Pleasant Station & Tunnels

    Segment lining joint checks and cross-passage construction support.

  12. 2020

    2020–2023

    Changi East inter-terminal bored tunnels

    Temporary works, temporary-loading checks and BHS precast invert slab design.

  13. 2020

    2020–2025

    C3C · Tuas Water Reclamation Plant

    ERSS design and supervision, and piling instrumentation and monitoring design.

  14. 2020

    2020–2021

    CR110 · Tampines North to Defu

    Tender design of tunnel segmental lining, adits and cross passages.

  15. 2019

    2019

    Contract 715 · North East Line Extension

    Design checking of bored tunnel segment lining joints.

  16. 2018

    2018–2024

    T11 · Deep Tunnel Sewerage System Phase 2

    QP geotechnical supervision; segmental lining, shafts and mined adit design.

  17. 2018

    2018–2019

    C883 · Cantonment Station, Circle Line 6

    Underpass pipe-roofing tunnel design for Entrances A and C.

  18. 2018

    2018–2019

    C1A · Tuas Water Reclamation Plant

    Temporary entrance structure and shaft construction temporary works.

  19. 2018

    2018

    T206 · Thomson–East Coast Line

    ERSS design for water-holding facilities and enabling works.

  20. 2018

    2018

    T10 · Deep Tunnel Sewerage System Phase 2

    ERSS design for electrical works.

  21. 2018

    2018–2021

    Pulau Tekong polder

    Geotechnical bearing-capacity assessment for PVD machine.

  22. 2018

    2018–2020

    Temporary Jurong East Bus Interchange & Pedestrian Overhead Bridge

    Temporary works design and construction support.

  23. 2018

    2018–2019

    Sumang Walk public housing development

    Temporary works design and construction support.

  24. 2018

    2018–2020

    70 Anson Road commercial building

    Temporary works design and construction support.

Hover to pause · drag, swipe or use the arrows24 projects

Discuss your project with SGT

Speak with SGT about your project requirements.

Contact our team
Chat on WhatsApp

Chat with our team

+65 6016 0668 (WhatsApp, opens in a new tab)+65 6917 6445 (WhatsApp, opens in a new tab)